{"id":3222,"date":"2025-07-30T11:01:31","date_gmt":"2025-07-30T10:01:31","guid":{"rendered":"https:\/\/viapribina.sk\/?p=3222"},"modified":"2025-08-04T09:32:51","modified_gmt":"2025-08-04T08:32:51","slug":"via-pribina-concessionaire-completes-the-main-stage-of-the-r1-highway-renovation-one-month-ahead-of-schedule","status":"publish","type":"post","link":"https:\/\/viapribina.sk\/en\/2025\/07\/via-pribina-concessionaire-completes-the-main-stage-of-the-r1-highway-renovation-one-month-ahead-of-schedule\/","title":{"rendered":"Via Pribina Concessionaire completes the main stage of the R1 highway renovation one month ahead of schedule"},"content":{"rendered":"<ul class=\"wp-block-list\">\n<li>37 km renovated in the direction of Bratislava<\/li>\n\n\n\n<li>100% of the asphalt recycled in local plants<\/li>\n\n\n\n<li>the renovation of the entire Via Pribina expressway will be completed in 2026. This is the largest modernization project since the section was opened in 2011.<\/li>\n<\/ul>\n\n\n\n<p>Via Pribina, the concessionaire of the R1 highway, is currently completing the reconstruction of a 52-kilometer corridor in the direction of Bratislava. The entire lane in the opposite direction was replaced last year.<\/p>\n\n\n\n<p>As part of this year&#8217;s renovation, the original top layer of the road surface was removed and replaced with a new asphalt mixture. The total area with a new surface exceeds 290,000 m\u00b2. All 30,000 tons of old asphalt were recycled at local plants.<\/p>\n\n\n\n<p>The renovation also included new horizontal road markings, which improve traffic visibility and safety. More than 110,000 meters of asphalt grouting was carried out.<\/p>\n\n\n\n<p>The concessionaire, together with the contractor, EUROVIA SK, will complete the work one month ahead of schedule. This was made possible by thorough planning and an efficient construction schedule. The work was carried out with consideration for drivers, even at night, which allowed the work to proceed as quickly as possible.<\/p>\n\n\n\n<p>Night work also contributed to smoother traffic flow during the day and reduced the need for &nbsp;&nbsp;restrictions. Restrictions were minimal and at least one lane remained open at all times.<\/p>\n\n\n\n<p>The resurfacing is part of a wider program to renovate the R1 Via Pribina expressway, which began in 2023. The final, third phase will be completed in 2026 and will involve the remaining branches of the individual intersections.<\/p>\n\n\n\n<p>At the end of this phase, the surface of the entire Via Pribina highway, including the junctions, will be completely modernized. This is the most extensive renovation since the expressway opened in 2011.<\/p>\n\n\n\n<p>This renovation is an important step towards maintaining optimal safety and comfort for drivers. The Via Pribina project \u2013 the first expressway in Slovakia built under a PPP model \u2013 in cooperation with the Ministry of Transport of the Slovak Republic confirms the success of public-private partnerships. With its investments, it has been fulfilling the performance indicators set by the public authorities of the Slovak Republic for a long time.<\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><img fetchpriority=\"high\" decoding=\"async\" width=\"1024\" height=\"683\" src=\"https:\/\/viapribina.sk\/wp-content\/uploads\/2025\/07\/011_Viapribina_Pohranice-1-1024x683.jpg\" alt=\"\" class=\"wp-image-3223\" srcset=\"https:\/\/viapribina.sk\/wp-content\/uploads\/2025\/07\/011_Viapribina_Pohranice-1-1024x683.jpg 1024w, https:\/\/viapribina.sk\/wp-content\/uploads\/2025\/07\/011_Viapribina_Pohranice-1-300x200.jpg 300w, https:\/\/viapribina.sk\/wp-content\/uploads\/2025\/07\/011_Viapribina_Pohranice-1-768x512.jpg 768w, https:\/\/viapribina.sk\/wp-content\/uploads\/2025\/07\/011_Viapribina_Pohranice-1-1536x1024.jpg 1536w, https:\/\/viapribina.sk\/wp-content\/uploads\/2025\/07\/011_Viapribina_Pohranice-1-18x12.jpg 18w, https:\/\/viapribina.sk\/wp-content\/uploads\/2025\/07\/011_Viapribina_Pohranice-1-36x24.jpg 36w, https:\/\/viapribina.sk\/wp-content\/uploads\/2025\/07\/011_Viapribina_Pohranice-1-48x32.jpg 48w, https:\/\/viapribina.sk\/wp-content\/uploads\/2025\/07\/011_Viapribina_Pohranice-1.jpg 2048w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><\/figure>","protected":false},"excerpt":{"rendered":"<p>Via Pribina, the concessionaire of the R1 highway, is currently completing the reconstruction of a 52-kilometer corridor in the direction of Bratislava. The entire lane&hellip;<\/p>","protected":false},"author":1,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[11],"tags":[],"class_list":["post-3222","post","type-post","status-publish","format-standard","hentry","category-en-en"],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v27.4 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Via Pribina Concessionaire completes the main stage of the R1 highway renovation one month ahead of schedule - viapribina<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/viapribina.sk\/en\/2025\/07\/via-pribina-concessionaire-completes-the-main-stage-of-the-r1-highway-renovation-one-month-ahead-of-schedule\/\" \/>\n<meta property=\"og:locale\" content=\"en_GB\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Via Pribina Concessionaire completes the main stage of the R1 highway renovation one month ahead of schedule - viapribina\" \/>\n<meta property=\"og:description\" content=\"Via Pribina, the concessionaire of the R1 highway, is currently completing the reconstruction of a 52-kilometer corridor in the direction of Bratislava. The entire lane&hellip;\" \/>\n<meta property=\"og:url\" content=\"https:\/\/viapribina.sk\/en\/2025\/07\/via-pribina-concessionaire-completes-the-main-stage-of-the-r1-highway-renovation-one-month-ahead-of-schedule\/\" \/>\n<meta property=\"og:site_name\" content=\"viapribina\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/pr1bina\" \/>\n<meta property=\"article:published_time\" content=\"2025-07-30T10:01:31+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2025-08-04T08:32:51+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/viapribina.sk\/wp-content\/uploads\/2025\/07\/011_Viapribina_Pohranice-1.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"2048\" \/>\n\t<meta property=\"og:image:height\" content=\"1365\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"admin.955832\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"admin.955832\" \/>\n\t<meta name=\"twitter:label2\" content=\"Estimated reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"2 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/viapribina.sk\\\/en\\\/2025\\\/07\\\/via-pribina-concessionaire-completes-the-main-stage-of-the-r1-highway-renovation-one-month-ahead-of-schedule\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/viapribina.sk\\\/en\\\/2025\\\/07\\\/via-pribina-concessionaire-completes-the-main-stage-of-the-r1-highway-renovation-one-month-ahead-of-schedule\\\/\"},\"author\":{\"name\":\"admin.955832\",\"@id\":\"https:\\\/\\\/viapribina.sk\\\/en\\\/#\\\/schema\\\/person\\\/8ce48c8b6d774bc8964cd9c08521df3e\"},\"headline\":\"Via Pribina Concessionaire completes the main stage of the R1 highway renovation one month ahead of schedule\",\"datePublished\":\"2025-07-30T10:01:31+00:00\",\"dateModified\":\"2025-08-04T08:32:51+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/viapribina.sk\\\/en\\\/2025\\\/07\\\/via-pribina-concessionaire-completes-the-main-stage-of-the-r1-highway-renovation-one-month-ahead-of-schedule\\\/\"},\"wordCount\":373,\"publisher\":{\"@id\":\"https:\\\/\\\/viapribina.sk\\\/en\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/viapribina.sk\\\/en\\\/2025\\\/07\\\/via-pribina-concessionaire-completes-the-main-stage-of-the-r1-highway-renovation-one-month-ahead-of-schedule\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/viapribina.sk\\\/wp-content\\\/uploads\\\/2025\\\/07\\\/011_Viapribina_Pohranice-1-1024x683.jpg\",\"articleSection\":[\"English\"],\"inLanguage\":\"en-GB\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/viapribina.sk\\\/en\\\/2025\\\/07\\\/via-pribina-concessionaire-completes-the-main-stage-of-the-r1-highway-renovation-one-month-ahead-of-schedule\\\/\",\"url\":\"https:\\\/\\\/viapribina.sk\\\/en\\\/2025\\\/07\\\/via-pribina-concessionaire-completes-the-main-stage-of-the-r1-highway-renovation-one-month-ahead-of-schedule\\\/\",\"name\":\"Via Pribina Concessionaire completes the main stage of the R1 highway renovation one month ahead of schedule - viapribina\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/viapribina.sk\\\/en\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/viapribina.sk\\\/en\\\/2025\\\/07\\\/via-pribina-concessionaire-completes-the-main-stage-of-the-r1-highway-renovation-one-month-ahead-of-schedule\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/viapribina.sk\\\/en\\\/2025\\\/07\\\/via-pribina-concessionaire-completes-the-main-stage-of-the-r1-highway-renovation-one-month-ahead-of-schedule\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/viapribina.sk\\\/wp-content\\\/uploads\\\/2025\\\/07\\\/011_Viapribina_Pohranice-1-1024x683.jpg\",\"datePublished\":\"2025-07-30T10:01:31+00:00\",\"dateModified\":\"2025-08-04T08:32:51+00:00\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/viapribina.sk\\\/en\\\/2025\\\/07\\\/via-pribina-concessionaire-completes-the-main-stage-of-the-r1-highway-renovation-one-month-ahead-of-schedule\\\/#breadcrumb\"},\"inLanguage\":\"en-GB\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/viapribina.sk\\\/en\\\/2025\\\/07\\\/via-pribina-concessionaire-completes-the-main-stage-of-the-r1-highway-renovation-one-month-ahead-of-schedule\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-GB\",\"@id\":\"https:\\\/\\\/viapribina.sk\\\/en\\\/2025\\\/07\\\/via-pribina-concessionaire-completes-the-main-stage-of-the-r1-highway-renovation-one-month-ahead-of-schedule\\\/#primaryimage\",\"url\":\"https:\\\/\\\/viapribina.sk\\\/wp-content\\\/uploads\\\/2025\\\/07\\\/011_Viapribina_Pohranice-1-1024x683.jpg\",\"contentUrl\":\"https:\\\/\\\/viapribina.sk\\\/wp-content\\\/uploads\\\/2025\\\/07\\\/011_Viapribina_Pohranice-1-1024x683.jpg\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/viapribina.sk\\\/en\\\/2025\\\/07\\\/via-pribina-concessionaire-completes-the-main-stage-of-the-r1-highway-renovation-one-month-ahead-of-schedule\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/viapribina.sk\\\/en\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Via Pribina Concessionaire completes the main stage of the R1 highway renovation one month ahead of schedule\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/viapribina.sk\\\/en\\\/#website\",\"url\":\"https:\\\/\\\/viapribina.sk\\\/en\\\/\",\"name\":\"viapribina\",\"description\":\"Ste na dobrej ceste\",\"publisher\":{\"@id\":\"https:\\\/\\\/viapribina.sk\\\/en\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/viapribina.sk\\\/en\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-GB\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/viapribina.sk\\\/en\\\/#organization\",\"name\":\"Granvia, a.s.\",\"url\":\"https:\\\/\\\/viapribina.sk\\\/en\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-GB\",\"@id\":\"https:\\\/\\\/viapribina.sk\\\/en\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/pr1bina.sk\\\/wp-content\\\/uploads\\\/2022\\\/02\\\/logo.jpg\",\"contentUrl\":\"https:\\\/\\\/pr1bina.sk\\\/wp-content\\\/uploads\\\/2022\\\/02\\\/logo.jpg\",\"width\":180,\"height\":41,\"caption\":\"Granvia, a.s.\"},\"image\":{\"@id\":\"https:\\\/\\\/viapribina.sk\\\/en\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"sameAs\":[\"https:\\\/\\\/www.facebook.com\\\/pr1bina\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/pr1bina\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/viapribina.sk\\\/en\\\/#\\\/schema\\\/person\\\/8ce48c8b6d774bc8964cd9c08521df3e\",\"name\":\"admin.955832\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-GB\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/8cbd662631361b7d02d860c22ceab9a6dc027158901accec6201ad2c2714e55d?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/8cbd662631361b7d02d860c22ceab9a6dc027158901accec6201ad2c2714e55d?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/8cbd662631361b7d02d860c22ceab9a6dc027158901accec6201ad2c2714e55d?s=96&d=mm&r=g\",\"caption\":\"admin.955832\"},\"sameAs\":[\"https:\\\/\\\/viapribina.sk\"],\"url\":\"\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Via Pribina Concessionaire completes the main stage of the R1 highway renovation one month ahead of schedule - viapribina","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/viapribina.sk\/en\/2025\/07\/via-pribina-concessionaire-completes-the-main-stage-of-the-r1-highway-renovation-one-month-ahead-of-schedule\/","og_locale":"en_GB","og_type":"article","og_title":"Via Pribina Concessionaire completes the main stage of the R1 highway renovation one month ahead of schedule - viapribina","og_description":"Via Pribina, the concessionaire of the R1 highway, is currently completing the reconstruction of a 52-kilometer corridor in the direction of Bratislava. The entire lane&hellip;","og_url":"https:\/\/viapribina.sk\/en\/2025\/07\/via-pribina-concessionaire-completes-the-main-stage-of-the-r1-highway-renovation-one-month-ahead-of-schedule\/","og_site_name":"viapribina","article_publisher":"https:\/\/www.facebook.com\/pr1bina","article_published_time":"2025-07-30T10:01:31+00:00","article_modified_time":"2025-08-04T08:32:51+00:00","og_image":[{"width":2048,"height":1365,"url":"https:\/\/viapribina.sk\/wp-content\/uploads\/2025\/07\/011_Viapribina_Pohranice-1.jpg","type":"image\/jpeg"}],"author":"admin.955832","twitter_card":"summary_large_image","twitter_misc":{"Written by":"admin.955832","Estimated reading time":"2 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/viapribina.sk\/en\/2025\/07\/via-pribina-concessionaire-completes-the-main-stage-of-the-r1-highway-renovation-one-month-ahead-of-schedule\/#article","isPartOf":{"@id":"https:\/\/viapribina.sk\/en\/2025\/07\/via-pribina-concessionaire-completes-the-main-stage-of-the-r1-highway-renovation-one-month-ahead-of-schedule\/"},"author":{"name":"admin.955832","@id":"https:\/\/viapribina.sk\/en\/#\/schema\/person\/8ce48c8b6d774bc8964cd9c08521df3e"},"headline":"Via Pribina Concessionaire completes the main stage of the R1 highway renovation one month ahead of schedule","datePublished":"2025-07-30T10:01:31+00:00","dateModified":"2025-08-04T08:32:51+00:00","mainEntityOfPage":{"@id":"https:\/\/viapribina.sk\/en\/2025\/07\/via-pribina-concessionaire-completes-the-main-stage-of-the-r1-highway-renovation-one-month-ahead-of-schedule\/"},"wordCount":373,"publisher":{"@id":"https:\/\/viapribina.sk\/en\/#organization"},"image":{"@id":"https:\/\/viapribina.sk\/en\/2025\/07\/via-pribina-concessionaire-completes-the-main-stage-of-the-r1-highway-renovation-one-month-ahead-of-schedule\/#primaryimage"},"thumbnailUrl":"https:\/\/viapribina.sk\/wp-content\/uploads\/2025\/07\/011_Viapribina_Pohranice-1-1024x683.jpg","articleSection":["English"],"inLanguage":"en-GB"},{"@type":"WebPage","@id":"https:\/\/viapribina.sk\/en\/2025\/07\/via-pribina-concessionaire-completes-the-main-stage-of-the-r1-highway-renovation-one-month-ahead-of-schedule\/","url":"https:\/\/viapribina.sk\/en\/2025\/07\/via-pribina-concessionaire-completes-the-main-stage-of-the-r1-highway-renovation-one-month-ahead-of-schedule\/","name":"Via Pribina Concessionaire completes the main stage of the R1 highway renovation one month ahead of schedule - viapribina","isPartOf":{"@id":"https:\/\/viapribina.sk\/en\/#website"},"primaryImageOfPage":{"@id":"https:\/\/viapribina.sk\/en\/2025\/07\/via-pribina-concessionaire-completes-the-main-stage-of-the-r1-highway-renovation-one-month-ahead-of-schedule\/#primaryimage"},"image":{"@id":"https:\/\/viapribina.sk\/en\/2025\/07\/via-pribina-concessionaire-completes-the-main-stage-of-the-r1-highway-renovation-one-month-ahead-of-schedule\/#primaryimage"},"thumbnailUrl":"https:\/\/viapribina.sk\/wp-content\/uploads\/2025\/07\/011_Viapribina_Pohranice-1-1024x683.jpg","datePublished":"2025-07-30T10:01:31+00:00","dateModified":"2025-08-04T08:32:51+00:00","breadcrumb":{"@id":"https:\/\/viapribina.sk\/en\/2025\/07\/via-pribina-concessionaire-completes-the-main-stage-of-the-r1-highway-renovation-one-month-ahead-of-schedule\/#breadcrumb"},"inLanguage":"en-GB","potentialAction":[{"@type":"ReadAction","target":["https:\/\/viapribina.sk\/en\/2025\/07\/via-pribina-concessionaire-completes-the-main-stage-of-the-r1-highway-renovation-one-month-ahead-of-schedule\/"]}]},{"@type":"ImageObject","inLanguage":"en-GB","@id":"https:\/\/viapribina.sk\/en\/2025\/07\/via-pribina-concessionaire-completes-the-main-stage-of-the-r1-highway-renovation-one-month-ahead-of-schedule\/#primaryimage","url":"https:\/\/viapribina.sk\/wp-content\/uploads\/2025\/07\/011_Viapribina_Pohranice-1-1024x683.jpg","contentUrl":"https:\/\/viapribina.sk\/wp-content\/uploads\/2025\/07\/011_Viapribina_Pohranice-1-1024x683.jpg"},{"@type":"BreadcrumbList","@id":"https:\/\/viapribina.sk\/en\/2025\/07\/via-pribina-concessionaire-completes-the-main-stage-of-the-r1-highway-renovation-one-month-ahead-of-schedule\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/viapribina.sk\/en\/"},{"@type":"ListItem","position":2,"name":"Via Pribina Concessionaire completes the main stage of the R1 highway renovation one month ahead of schedule"}]},{"@type":"WebSite","@id":"https:\/\/viapribina.sk\/en\/#website","url":"https:\/\/viapribina.sk\/en\/","name":"viapribina","description":"Ste na dobrej ceste","publisher":{"@id":"https:\/\/viapribina.sk\/en\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/viapribina.sk\/en\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-GB"},{"@type":"Organization","@id":"https:\/\/viapribina.sk\/en\/#organization","name":"Granvia, a.s.","url":"https:\/\/viapribina.sk\/en\/","logo":{"@type":"ImageObject","inLanguage":"en-GB","@id":"https:\/\/viapribina.sk\/en\/#\/schema\/logo\/image\/","url":"https:\/\/pr1bina.sk\/wp-content\/uploads\/2022\/02\/logo.jpg","contentUrl":"https:\/\/pr1bina.sk\/wp-content\/uploads\/2022\/02\/logo.jpg","width":180,"height":41,"caption":"Granvia, a.s."},"image":{"@id":"https:\/\/viapribina.sk\/en\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/pr1bina","https:\/\/www.linkedin.com\/company\/pr1bina"]},{"@type":"Person","@id":"https:\/\/viapribina.sk\/en\/#\/schema\/person\/8ce48c8b6d774bc8964cd9c08521df3e","name":"admin.955832","image":{"@type":"ImageObject","inLanguage":"en-GB","@id":"https:\/\/secure.gravatar.com\/avatar\/8cbd662631361b7d02d860c22ceab9a6dc027158901accec6201ad2c2714e55d?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/8cbd662631361b7d02d860c22ceab9a6dc027158901accec6201ad2c2714e55d?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/8cbd662631361b7d02d860c22ceab9a6dc027158901accec6201ad2c2714e55d?s=96&d=mm&r=g","caption":"admin.955832"},"sameAs":["https:\/\/viapribina.sk"],"url":""}]}},"_links":{"self":[{"href":"https:\/\/viapribina.sk\/en\/wp-json\/wp\/v2\/posts\/3222","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/viapribina.sk\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/viapribina.sk\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/viapribina.sk\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/viapribina.sk\/en\/wp-json\/wp\/v2\/comments?post=3222"}],"version-history":[{"count":2,"href":"https:\/\/viapribina.sk\/en\/wp-json\/wp\/v2\/posts\/3222\/revisions"}],"predecessor-version":[{"id":3226,"href":"https:\/\/viapribina.sk\/en\/wp-json\/wp\/v2\/posts\/3222\/revisions\/3226"}],"wp:attachment":[{"href":"https:\/\/viapribina.sk\/en\/wp-json\/wp\/v2\/media?parent=3222"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/viapribina.sk\/en\/wp-json\/wp\/v2\/categories?post=3222"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/viapribina.sk\/en\/wp-json\/wp\/v2\/tags?post=3222"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}